Application
Sand wood substrate, collecting resulting powder/dust and mix with Filler Gel to form a smooth paste. Fill joint/gap to maximum and allow to dry completely for 30-60 minutes. Proceed with final sanding of substrate to required level.
Always apply in dry, non humid conditions, at room temperature. Clean applicators with Acetone.